Abstract:According to the characteristics of the process of the model project, the risk management decision model of the model project is presented. Some essential risk factors of the project duration such as activity overlapping, activity iterations, uncertain activity durations and non-consumable resource amount are integrated into the decision model. Considering the characteristics of the model, a simulation optimization method based on adaptive genetic algorithm is proposed. A case study shows that the algorithm is beneficial.