Evaluation of the Missile Precision by Using theConstruction Simulation
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The prior distribution parameters of the falling points are obtained by using the construction simulation, then the credibility of the prior information is acquired by consistent test. The bayesian estimations of the mean and variance of the falling points are obtained by considering the credibility of the prior information. An example validates that it is successful to use the simulation information, and Bayesian estimation on considering the credibility has a better confidence level.

    Reference
    Related
    Cited by
Get Citation

YANG Huabo, ZHANG Shifeng, CAI Hong, YUE Yaoming. Evaluation of the Missile Precision by Using theConstruction Simulation[J]. Journal of National University of Defense Technology,2005,27(2):124-126 ,130.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 29,2004
  • Revised:
  • Adopted:
  • Online: March 25,2013
  • Published:
Article QR Code